Imperial Industries Incorporated Imperial Industries Incorporated
    Industrial Tanks | Commercial Waste | Calumet Tanks | Agricultural Bins

Agricultural Bins - Foundation Layout

Accessories | Foundation Layout | Delivery | Bins Quote Request |

Foundation Bolt Layout


chart-a.gif
Bin Model
Number
Bin
Dia.
D E F Bolt
Dia.
P
HP 55 - 56 5' 60" 42 7/16" 1' - 1" 1/2" 1 1/2"
HP 65 - 66 6' 72" 50 15/16" 1' - 3" 1/2" 1 1/2"
HP 75 - 76 7' 84" 59 3/8" 1' - 5" 1/2" 1 1/2"
HP 85 - 86 8' 96" 67 7/8" 1' - 7" 1/2" 1 1/2"
HP 95 - 96 9' 108" 76 3/8" 1' - 9" 1/2" 1 1/2"
HP/LP 98 - 99 9' 108" 76 3/8" 1' - 9" 1/2" 2 1/2"
HP/LP 910 - 920 9' 108" 76 3/8" 1' - 9" 3/4" 2 1/2"
HP/LP 1008 - 1016 10' 120" 84 7/8" 2' - 0" 3/4" 2 1/2"
HP/LP 1018 - 1024 10' 120" 84 7/8" 2' - 0" 1" 2 1/2"

Dimension "F" indicates required measurement from existing structure to bolt location in order to provide a minimum 5" clearance between bin wall and existing structure. Caution should be taken to consider any protruding eaves that could come in contact with the bin wall.

chart-b.gif


Bin Model
Number
Bin
Dia.
X Y F Z Bolt
Dia.
P
HP/LP 1026 - 1030 10' 113 13/16" 80 1/2" 2' - 0" 10" 3/4" 3 1/2"
HP/LP 1206 - 1250 12' 137" 96 7/8" 2' - 6" 12" 1" 3 1/2"


Note:

Concrete base should be greater than or, at minimum, equal to the diameter of the bin.

Example: 9' Dia. Bin should have a minimum 9' Sq. base.

Consult your local concrete contractor for information concerning concrete thickness and mix to match the load.

anchor_bolts.gif


Note:

Anchor bolts should protrude 1 1/2" to 3 1/2" above the concrete base to adequately accept Bin leg base plate. See column "P" to locate bolt protrusion dimension for your bin model.

Industrial Tanks | Commercial Waste | Calumet Tanks | Agricultural Bins | Contact Us | Site Map | Employment Opportunities
Copyright Imperial Industries Incorporated 1-800-558-2945
Contact Imperial Industries Imperial Industries Home Page